MDT Bridge Street Micropiles & Static Testing | Bigfork, MT
A bridge replacement project over the Swan River in the unincorporated town of Bigfork was planned. BAI provided micropile installation…
A bridge replacement project over the Swan River in the unincorporated town of Bigfork was planned. BAI provided micropile installation…
The Phase 4 addition to the Spokane Tribe Casino included a casino expansion, parking structure, an additional hotel wing, and…
The proposed Service Center facility included 300,000 square-feet of buildings from offices to maintenance storage facilities. Soft soils required ground…
A new paved road, approximately 7,200 feet long, was proposed to access the new Waste Management Adams County Landfill approximately…
Proposed alignment of 7,432 feet of 18-inch gravity sewer required geotechnical exploration and analysis. BAI investigated subsurface conditions through field…
BAI completed a geologic desk study for a new 14-mile, 230kV transmission line, with a total of 119 structures spanning…
Colbert Bridge No. 3703 over the Little Spokane River was originally constructed in 1953 and in recent years had been…
BAI’s construction team provided materials testing and special inspection for the Millennium North Hill Apartments. This exciting addition to the…
Staff Geologist, Kaila Savage, completed landfill drilling and sampling in Herber City, Utah. Kaila conduct Site Characterization Sampling at Heber…
BAI conducted geotechnical exploration and analysis for the proposed fuel containment building at 49 Degrees North Ski Resort in Stevens…