I-90 SH-41 Interchange Temporary Shoring | Post Falls, ID
BAI provided temporary shoring wall design to support phased construction of three new 155-foot-long prestressed concrete bridges supporting Interstate 90…
BAI provided temporary shoring wall design to support phased construction of three new 155-foot-long prestressed concrete bridges supporting Interstate 90…
BAI completed subsurface explorations, laboratory analysis, and provided geotechnical parameters and recommendations in a geotechnical report to support construction of…
BAI conducted geotechnical exploration at Priest Rapids Dam in support of required dam improvements. Fieldwork consisted of coring borings and…
BAI installed 57 production micropiles for a new foundation of a clarifier at the City of Chinook Wastewater Treatment Plant.…
A bridge replacement project over the Swan River in the unincorporated town of Bigfork was planned. BAI provided micropile installation…
The Phase 4 addition to the Spokane Tribe Casino included a casino expansion, parking structure, an additional hotel wing, and…
The proposed Service Center facility included 300,000 square-feet of buildings from offices to maintenance storage facilities. Soft soils required ground…
A new paved road, approximately 7,200 feet long, was proposed to access the new Waste Management Adams County Landfill approximately…
Proposed alignment of 7,432 feet of 18-inch gravity sewer required geotechnical exploration and analysis. BAI investigated subsurface conditions through field…
BAI completed a geologic desk study for a new 14-mile, 230kV transmission line, with a total of 119 structures spanning…