A bridge replacement project over the Swan River in the unincorporated town of Bigfork was planned. BAI provided micropile installation and static testing services to support structural improvements which included installation of eighteen production micropiles. Verification and performance testing were completed in accordance with the Design Engineer’s specifications and work was completed within schedule to allow for efficient replacement of the bridge.
Share this post