Sewer overflow control structures were constructed adjacent to Spokane River north of Mission Avenue. New 300-foot long reinforced concrete flow control structures were buried up to 30 feet below ground surface. Budinger was responsible for geotechnical engineering services to establish foundation design parameters and evaluate constructability to reach the required depths adjacent to existing features that included the river bank, city street, utilities, houses, and an apartment complex.